Construction Photo Documentation That Holds Up: Progress and Handover

Construction photo documentation holds up when each photo is captured live, dated by an independent authority, sealed against later changes and open to verification by the client, the insurer or an expert, without relying on the contractor's word.

By Cédric Driaux, Founder of tryVidimus

Drawing of a brick wall being built, a crane and a hard hat

Where construction photo documentation gets disputed

Site teams already take photos all day. This article belongs to our series on photo evidence use cases and looks at one question: what makes construction photo documentation hold up when someone challenges it. The problem is rarely a lack of photos. It is that nobody outside the company can check them.

Three situations come up again and again:

  • Hidden works. Pipes, cables, insulation or waterproofing disappear behind a wall or under a screed. Once the work is closed, the photo is the only thing left to show, and the first question is when it was taken.
  • Progress and delays. A contractor says a stage was finished on a given day, and the client says it was not. Photos kept on the site manager's phone carry a date that the phone itself wrote.
  • Reserves at handover. A defect is noted at handover, then repaired, or a new mark appears after the keys change hands. Each side has photos, and nobody neutral can tie either set to a date.

Take a tiled bathroom. Some time after handover, a leak appears behind the wall. The plumber has photos of the pipework before the wall was closed, sent at the time to a messaging group. The other side asks whether they show this bathroom, on that day, and whether they were edited. The photos cannot answer.

Key capture moments on a construction site

A proof is useful only if it exists before the disagreement. On a site, that means capturing at the moments after which the work can no longer be seen, or changes hands.

MomentWhat to captureThe question it answers later
Before closing hidden worksPipes, cables, insulation, waterproofing or reinforcement, with a wide shot that places them in the room.“What is behind this wall, and was it photographed before the wall was closed?”
End of a stageThe finished stage, from the same viewpoints at each visit.“Was this stage complete on that date?”
HandoverEach reserve, close up and in its surroundings.“What exactly was noted on the day?”
After a reserve is dealt withThe same spot, with the same framing, linked to the handover capture.“Was the defect repaired, and when?”

Two habits make these captures stronger. Take a wide shot before each close-up, so that the detail can be placed in the building. And keep the same list of shots from one visit to the next: with tryVidimus, a shot template defines the photos requested, and the person on site follows it.

For a reserve, two proofs can be linked: the capture made after the repair points back to the capture made at handover. tryVidimus does not compare the two and does not judge whether the repair is acceptable. It gives those who decide two dated states to look at.

How a sealed site photo is made

tryVidimus is an API. It plugs into the application your teams already use on site, whether your company builds that software or a vendor does. The journey has five steps.

  1. The application asks for a capture. One API call creates a capture link and carries a reference chosen by the application, such as the site or the lot.
  2. The person on site opens the link. A capture page opens in the phone's browser, with your logo and your wording. There is nothing to install, which matters when subcontractors change from one site to the next.
  3. The photos are taken live. The camera is the only source: there is no upload from the gallery, so a photo from another site or another day cannot slip in.
  4. The proof is sealed. Each file gets a SHA-256 fingerprint, the proof receives a qualified electronic timestamp, and each photo is signed under the C2PA standard.
  5. Anyone can verify. The proof has a public verification page, open without an account.

The timestamp is the part that answers “when”. A qualified trust service provider issues it, not the phone and not your company. Our article on how to prove when a photo was taken explains why the date written by a device is not enough.

Organising site photos by reference and date

A site produces a lot of photos, and a proof nobody can find is of little use. tryVidimus does not sort photos into lots or folders for you. Each capture carries the reference your application supplied when it created the link, and proofs are found again through that reference.

So the organisation lives in your application, where it already is. In practice:

  • Choose one reference scheme and keep it. A site identifier, or a site and a lot, is enough as long as it stays the same from the first capture to handover.
  • Create one capture per moment, not one per month. “Plumbing lot, second floor, before closing” is easier to find later than a long mixed series.
  • Let the timestamp carry the date. Do not rely on file names or on a date printed on the image: the certified date is in the proof itself.

On dates, be precise about what is certified. The “captured at” time shown on a proof is the time observed by the service, and it is not qualified. The qualified time is the one issued by the timestamp authority when the proof is sealed.

Retention deserves a thought too, because a disagreement about a building can surface long after the work. tryVidimus keeps proofs for 24 months, hosted in the European Union. Check that this fits the life of your projects before you rely on it alone.

Sharing proofs with clients and insurers

A proof is shared as a link. The client, the architect, an insurer or an expert opens the public verification page without an account. There they can check the certified date and that nothing has changed since the proof was sealed.

They do not have to trust our servers either. The verifier is open source, and the timestamp can be checked with OpenSSL, a standard tool.

Claims teams ask the same questions about origin and date, as our article on verified photos for insurance claims describes.

One legal reference applies to the date, in the European Union only. Under Article 41 of the eIDAS Regulation, a qualified electronic time stamp enjoys a presumption of the accuracy of the date and time it indicates and of the integrity of the data to which they are bound. Our guide to the qualified timestamp under eIDAS explains what that covers and what it leaves open.

To see two linked proofs in a full journey, before and after, read the use cases page. The price is on the pricing page.

Frequently asked questions

Are timestamped construction photos accepted as evidence?

It depends on the country and on the dispute, and no photo is accepted automatically. What a sealed photo adds is a date certified by an independent authority and a way for anyone to check that the file has not changed. In the European Union, a qualified electronic timestamp carries a presumption of accuracy of the date under Article 41 of the eIDAS Regulation. For a specific case, ask a lawyer.

Do subcontractors need to install an app?

No. The capture page is a web page opened from a link, in the phone's browser or inside your own application. It carries your logo, your colour and your wording. A subcontractor who comes for a single day opens the link, takes the requested photos and closes the page, with nothing to install on the phone.

Does tryVidimus check that the work was done correctly?

No. tryVidimus certifies and never arbitrates. A sealed proof shows that the photos existed at a certified date, have not changed since and came from a live capture. It does not assess the quality of the work, compare two photos or decide whether a reserve is closed. The client, the contractor, an expert or a judge draw those conclusions.

Can I try it with a site team before going live?

Yes, in the sandbox, which is free. You can build the whole journey, from the capture link to the verification page, and try it with a site team. Timestamps in the sandbox are simulated and have no legal value, so a sandbox proof must not be used as evidence. Qualified timestamps are issued in production only.

Try it in the sandbox

Construction photo documentation holds up when someone who does not trust you can check the date and the integrity of each photo. Capture at the moments that disappear: before closing, at the end of a stage, at handover. You can build and test the whole journey for free in the sandbox, without a card.